Project Costs

We currently estimate the cost of developing our system to be nothing as all of the necessary parts are provided by the CSE Department. Below is a list of preliminary parts.

Part Name Manufacturer Part Number Supplier Cost
XSV-300 Xillinx XSV300 CSE Dept. No Cost
Spectronix RoboCam Spectronix RC-1BW CSE Dept. No Cost
Virtual Wire Development Kit RF Monolithics DR1004-DK CSE Dept. No Cost
XSV-40 Xillinx XSV40-010XL CSE Dept No Cost
Windows CE Device Unknown Unknown CSE Dept No Cost