Assignments
Assignment 1: Core Networks
Due: Friday October 22, 11:59PM
In this assignment you will set up a 5G core network, connect a simulated radio (known as a gNodeB), and then connect a simulated handset (known as a UE) to that radio.
See https://canvas.uw.edu/courses/1541942/assignments/6758019 for details.
Assign 2: Building Wireless Links
Due: Wednesday November 3, 11:59PM
See https://docs.google.com/document/d/1Zvb1TNe0dXOqGQkaJjLK7YdQCtIkBZxUzW5iJwu0Jhk/edit?usp=sharing for details.
Assign 3: De-invisibilizing physical infrastructure
Due: Monday November 15, 11:59PM
In this assignment you will reason about wireless network resource utilization, make and analyze network measurements to identify likely bottlenecks in real-world networks, and identify practical similarities and differences between 3GPP (LTE/5G/xG) and WiFi-based wireless networks.
See https://docs.google.com/document/d/1IbJDW8TpRVuBfXrodTaHhHKPiP3O7fPxU8oeZlSXHQY/edit# for details.