From: Janet Davis (jlnd_at_cs.washington.edu)
Date: Tue Feb 10 2004 - 11:29:40 PST
On Tue, 10 Feb 2004, Crystal Hoyer wrote:
> I was wondering if you could describe what you mean by arbitrary link
> costs versus shortest-hops? (what is the difference in the scenario
> between parts b and c)
Shortest-hops means every link has cost 1; with arbitrary link costs, they
can be anything.
Cheers,
Janet
-- Janet Davis jlnd_at_cs.washington.edu http://www.cs.washington.edu/homes/jlnd/ _______________________________________________ Cse461 mailing list Cse461_at_cs.washington.edu http://mailman.cs.washington.edu/mailman/listinfo/cse461
This archive was generated by hypermail 2.1.6 : Tue Feb 10 2004 - 11:29:43 PST