Date |
Topic and readings | Announcements |
---|---|---|
9/27/2007 No Class |
No Class -- see email. |
|
10/2/2007 Introduction |
Required Reading:
Optional Reading:
|
|
10/4/2007 Introduction |
Required Reading:
Optional Reading:
|
Project: Determine Groups (due 10/5/2007, 11:59pm, by email) |
10/9/2007 Human Factors |
Required Reading:
Optional Reading:
|
|
10/11/2007 Human Factors |
Required Reading:
Optional Reading:
|
|
10/16/2007 Attack Detection, Measurement, Experiment, and Modeling |
Required Reading:
Optional Reading:
|
Project: Proposals Due (11:59pm, upload to Catalyst) |
10/18/2007 Attack Detection, Measurement, Experiment, and Modeling |
Required Reading:
Optional Reading:
|
|
10/23/2007 Attack Detection, Measurement, Experiment, and Modeling |
Required Reading:
Optional Reading:
|
|
10/25/2007 Cryptography: Basic Primitives and Protocols |
Required Reading:
Optional Reading: |
|
10/30/2007 Cryptography: Basic Primitives and Protocols |
Required Reading:
Optional Reading:
|
|
11/1/2007 Cryptography: Basic Primitives and Protocols |
Required Reading:
Optional Reading:
|
|
11/6/2007 Cryptography: Applications and Network Security |
Required Reading:
|
Attack Lab: Hand out |
11/8/2007 Cryptography: Applications and Network Security |
Required Reading:
|
|
11/13/2007 Cryptography: Applications and Network Security |
Required Reading:
|
Project: Checkpoint (11/10/2007, 11:59pm, upload to Catalyst) |
11/15/2007 System Design and Implementation |
Required Reading:
Optional Reading:
|
|
11/20/2007 System Design and Implementation |
Required Reading:
Optional Reading:
|
Attack Lab: Due (by 11:59pm to Catalyst) |
11/27/2007 System Design and Implementation |
Required Reading:
Optional Reading:
|
|
11/29/2007 System Design and Implementation, Side Channels, and Anonymity |
Required Reading:
Optional Reading:
|
Project: Draft of Written Report (11:59pm, upload to Catalyst) |
12/4/2007 None |
||
12/6/2007 None |
Project: Peer Reviews (of Drafts) Due (11:59pm, to Catalyst) | |
12/13/2007 Project Presentations |
Project presentations (10:30am--12:20pm, EEB 003) |
Project: Presentations and Final Written Reports Due (10:30am, upload both the presentation and the written report to Catalyst) |