CSE403 Project Milestone Submissions

LCO (Project Proposals) (Jun 29)

Here is a downloadable video (~96MB) of all presentations.

LCA (Architecture, Design, and Test Planning) (Jul 12-13)

Due to technical problems, the video was not captured and recorded properly.

Zero-Feature (Early Integration) Release (Jul 20)

Here is a downloadable video (~90MB) of the presentations, as well as of the demos (OpEnSpaCe, TeamForge).

Beta Release (Aug 02)

Here is a downloadable video (~98MB) of the presentations, as well as of the demos (OpEnSpaCe, TeamForge).

Final Release (Aug 13-14)

Here is a downloadable video (~99MB) of the presentations, as well as of the demos (OpEnSpaCe, TeamForge).