    Due Lecture Topic Reading
Week 1
9/29-10/3
M   Introduction  
W   Overview Ch. 1, Skim Ch. 2
F   Lexical analysis Sections 3.1, 3.3, 3.4 -- 3.7
Week 2
10/6-10/10
M   Lexical analysis
W   Parsing Sections 4.1 -- 4.3 (except "Verifying the Language Generated by a Grammar", pp 173--4), 4.4, 4.9
F #1: Scanner Parsing
Week 3
10/13-10/17
M   Parsing
W   Parsing
F #2: EBNF Parsing
Week 4
10/20-10/24
M   Semantic Analysis Sections 7.1 to p. 394 (inclusive), 7.6, 8.2, 6.1 -- 6.4, (Optional: sections 6.5 & 6.6)
W   Semantic Analysis
F #3: Parser Semantic Analysis
Week 5
10/27-10/31
M   Midterm Review
W    Midterm 
F   Case Study: ZPL  
Week 6
11/3-11/7
M #3.5: Type Check Spec Run-time Environment
W   Run-time Environment Sections 7.1 -- 7.5, 7.7, 7.8
F   Run-time Environment
Week 7
11/10-11/14
M #4: Type Check Run-time Environment
W   Run-time Environment
F   Case Study: ZPL
Week 8
11/17-11/21
M #5: Storage Intermediate Code Gen Sections 8.1, (8.2 above), 8.3, 8.4, 8.7, (Optional: 8.6)
W   Intermediate Code Gen
F   Target Code Gen Sections 9.1 -- 9.3, 9.6 -- 9.8, 9.10
Week 9
11/24-11/28
M   Target Code Gen
W   Optimization
F   Holiday Sections 9.4, 9.5, 9.9, 10.1, 10.2
Week 10
12/1-12/5
M   Optimization
W #6: Code Gen Optimization
F   Review  
Week 11
12/8-12/10
M

 

Midterm 2  
W #7: Mystery Project   Wrap-up  
 

Final Exam
( 8:30-10:20, Wednesday, December 17, 2003)


CSE logo Computer Science & Engineering
University of Washington
Box 352350
Seattle, WA  98195-2350
(206) 543-1695 voice, (206) 543-2969 FAX
[comments to cse401-webmaster at cs.washington.edu]