|
|
|
|
|
|
|
|
|
|
|
|
|
• |
For
perfective maintenance, the objective should
|
|
|
|
be
for the cost of the change in the implementation
|
|
|
to
be proportional to the cost of the change in the
|
|
|
|
specification
(design)
|
|
|
|
– |
Ex:
Allowing dates for the year 2000 is (at most) a
|
|
|
|
small
specification change
|
|
|
|
– |
Ex:
Adding call forwarding is a more complicated
|
|
|
|
specification
change
|
|
|
|
– |
Ex:
Converting a compiler into an ATM machine is …
|
|